Newsroom Ed. Züblin AG / STRABAG AG

DE
Follow Newsroom Ed. Züblin AG / STRABAG AG

Press releases View all 78 hits

Out-of-court settlement over North-South Cologne Stadtbahn project

Out-of-court settlement over North-South Cologne Stadtbahn project

Press releases   •   Jun 29, 2020 18:00 CEST

+++ Disputes settled over collapse of the city archive building on 3 March 2009: consortium consisting of Bilfinger SE, Wayss & Freytag Ingenieurbau AG and Ed. Züblin AG reaches settlement with the City of Cologne and Kölner Verkehrs-Betriebe AG (KVB) +++ City of Cologne’s claims settled by payment of € 600 million +++

DigiRAB research project develops digital solutions for safe construction sites

DigiRAB research project develops digital solutions for safe construction sites

Press releases   •   Jun 29, 2020 11:17 CEST

+++ Project partners developed digital assistance systems for collaborative planning, management and training in occupational safety +++ DigiRAB solutions improve occupational safety on the construction site +++ BIM extension for hazard prevention, real-time warning system with RFID technology and realistic VR teaching modules +++

ZÜBLIN appointed by AXA IM - Real Assets as general contractor for MARK München

ZÜBLIN appointed by AXA IM - Real Assets as general contractor for MARK München

Press releases   •   Jun 17, 2020 14:00 CEST

+++ Turnkey construction of office building with up to eight floors and two basement levels +++ Project collaboration under teamconcept partnering +++ Contract includes demolition and construction pit +++

ZÜBLIN completes new bridge and walkways in Höllentalklamm Gorge

ZÜBLIN completes new bridge and walkways in Höllentalklamm Gorge

Press releases   •   May 22, 2020 14:44 CEST

+++ Total of approx. 600 individual parts assembled +++ ZÜBLIN supports German Alpine Club’s Garmisch-Partenkirchen section under sponsorship arrangement +++ Höllentalklamm Gorge is situated on the trail to the Zugspitze +++

News View all 15 hits

2nd core route in Munich: Start of diaphragm wall works at the central railway station

2nd core route in Munich: Start of diaphragm wall works at the central railway station

News   •   May 07, 2020 17:14 CEST

At Munich’s central railway station, the 2nd core route will run underneath all existing platform levels.

Award for ZÜBLIN Timber’s Regensburg Synagogue project

Award for ZÜBLIN Timber’s Regensburg Synagogue project

News   •   Apr 30, 2020 10:00 CEST

+++ Unique wooden dome wins award in GEPLANT+AUSGEFÜHRT architecture competition +++ ZÜBLIN Timber responsible for complex roof elements made from double-curved LENO® cross-laminated timber +++

ZÜBLIN and HOCHTIEF hand over M4 metro line in Copenhagen

ZÜBLIN and HOCHTIEF hand over M4 metro line in Copenhagen

News   •   Mar 31, 2020 14:37 CEST

+++ Safety at metro project top notch +++ Well-managed schedules, quality and finances +++ Impressive drone video shows new M4 metro line +++

EDGE East Side Berlin – Construction awarded to ZÜBLIN

EDGE East Side Berlin – Construction awarded to ZÜBLIN

News   •   Feb 20, 2020 10:13 CET

+++ scheduled for completion by 2023 +++

Images View all 5 hits

Bavarian Minister Ilse Aigner visits ZÜBLIN’s Bavaria Sub-Division in Munich.

Bavarian Minister Ilse Ai...

License Media Use
Photographer / Source Ed. Züblin AG
Download
Size

3.8 MB • 5760 x 3840 px

Elbterrassen in Geesthacht

Elbterrassen in Geesthacht

A home with a river view: After the start of construction in September 2016, about 150 guests on 29 June 2017 celebrated the topping out ...

License Media Use
Photographer / Source Ed. Züblin AG
Download
Size

857 KB • 2953 x 1969 px

An innovative water treatment system from Züblin Umwelttechnik GmbH guarantees the water supply at IGA (Copyright: Armin Okulla)

An innovative water treat...

Crystal-clear water for the attractions at IGA: An innovative water treatment system from Züblin Umwelttechnik GmbH guarantees the water ...

License Media Use
Photographer / Source Copyright: Armin Okulla
Download
Size

770 KB • 2362 x 1575 px

Rendering of Maggie´s Cancer Centre Oldham, England

Rendering of Maggie´s Can...

License Media Use
Photographer / Source (Image credits: dRMM | de Rijke Marsh Morgan Architects)
Download
Size

1.73 MB • 1920 x 1280 px

Videos View all 5 hits

25 years of teamconcept

25 years of teamconcept

25 years ago, the STRABAG Group developed the foundations of its partnering model teamconcept and, as one of the pioneers of the partners...

License Media Use
Download
Size

640 x 360 px

ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019

ZÜBLIN, Stuttgart 21, Nom...

With the construction of the chalice supports for the Stuttgart 21 project, Züblin is nominated for bauma innovation award 2019.

License Media Use
Download
Size

640 x 360 px

Digital Object Survey

Digital Object Survey

STRABAG has been realizing the vision of digital object survey from the ground and from the air with state-of-the-art technologies for ye...

License Media Use
Download
Size

640 x 360 px

STRABAG topping out ceremony loop

STRABAG topping out cerem...

License All rights reserved
Size

640 x 360 px

Documents View all 16 hits

ZÜBLIN Umwelttechnik: Environmental Technology
Züblin Umwelttechnik GmbH: Construction Water Cleanup (brochure)

Learn more about Plant Technology for construction sites such as Ventilation facilities, ion exchangers, nitrite removal, gravel filters and inclined clarifiers.

ZÜBLIN Timber: Timber Construction Competence (english)
ZÜBLIN Timber: LENO® Cross Laminated Timber (CLT)

Contacts 3 hits

  • Press Contact
  • Corporate Communications
  • veburedxnadj.cuelasiasaxensu@soqtrhvabfoaghc.covomdf
  • +49 221 824-2605

  • Press Contact
  • Corporate Communications
  • saglbilunevf.ajappaselrq@svytrxrabzyagij.cyhomqa
  • + 49 0221 824-2159

  • Press Contact
  • Head of Corporate Communications Germany/Benelux/Northern Europe
  • prynesoeseyo@ssstrouabbxagzq.cxeomug
  • +49 221 824-2472