Newsroom Ed. Züblin AG / STRABAG AG

DE
Follow Newsroom Ed. Züblin AG / STRABAG AG

TORKRET, Façade renovation of the Lindner Congress Hotel, Düsseldorf, 2018

Image   •   Aug 24, 2020 12:22 CEST

Façade renovation Lindner Congress Hotel, Düsseldorf: The repair, which was split into two phases, comprised exposed concrete exterior surfaces, balcony and façade elements, and the front-facing supply tower with a total surface area of 8,000 m². TORKRET removed local concrete and corrosion damage and coated the exposed prefabricated concrete elements for lasting surface protection while the hotel was in full operation. Work on the outside of the balcony parapets was only possible using suspended scaffolding. The workflow was coordinated with the hotel management in such a way that the labour-intensive work on the scaffolding could be reduced to a minimum
License Media Use (?)
Photographer / Source TORKRET GmbH
Size 3.53 MB
Format .jpg
Image dimensions 4032 x 3024 pixels