Newsroom Ed. Züblin AG / STRABAG AG

DE
Follow Newsroom Ed. Züblin AG / STRABAG AG

STRABAG, BIM

Image   •   Oct 27, 2020 10:07 CET

The design, construction and subsequent operation of the new building is being realised using the BIM 5D® (Building Information Modelling) method.
License Media Use (?)
Photographer / Source STRABAG
Size 1.7 MB
Format .jpg
Image dimensions 5000 x 3339 pixels